What is the difference between Refinishing and Refacing?

Refacing involves replacing the doors and drawer fronts of your cabinets while keeping the existing cabinet boxes.

Refinishing involves removing the existing cabinet doors and drawer faces, sanding or stripping off the old finish, and applying a new coating to the doors, drawer faces, and cabinets.

 

What Additional Features are offered by RENEW Cabinets?

We offer many additional services upon request. Be sure to discuss any requests during your estimate process. Our Design Consultants will be happy to review what we have to offer.

Crown Mouldings

Soft Close Hinges

Quartz and Granite Countertops

Backsplash installation

Custom Hoods

Custom Islands

Bathroom Vanity Refinishing/Refacing

Soft Close Drawer slide installation

Custom Cabinets

Pantry Cabinets

Wine Bars

Backsplash

More upon request

 

How long does the process take?

Depending on how much custom work is requested by the client, our process takes 3-5 days to complete.

 

What does each day of my project look like?

Day 1– We do all the cleaning and preparation.

Day 2– We complete the refinishing process to your cabinet frame boxes

Day 3– We are in the shop processing your doors. Typically, we will not need to be in the home unless there is custom work being done as part of your project.

Day 4– We put everything back together again for your final inspection and sign off.

 

Will I need to empty all of my cabinets out?

Typically, no. There are times when we will need some cabinets empty depending on what custom work is requested. We would also need drawers empty if refacing is part of your project.

Will I have access to my kitchen during the process?

For most of the duration of your project, you will have limited access to your kitchen while your technician is completing the work. However, there is only one full day you will not have access due to the preparation materials/masking being up etc. However, we are flexible and understand there are matters such as access to the refrigerator in order to care for loved ones and such. Technicians often times work around you as best they can. Be sure to communicate your need to the technicians and during your pre-project start date call with the Operations Manager.

Are the products used water or oil based?

We use eco-friendly water-based products.

 

How much should I expect to spend on a kitchen project?

RENEW Cabinets has a 3-5 day per week project based business model and we do not provide smaller services such as small repairs unless done as part of a larger project. For this reason, we have a minimum of $3,900


 